Back to Top

252 meter long bridge to be constructed on Hrazdan River

armenpress.am09/11th/2019, 3:00

252 meter long bridge to be constructed on Hrazdan River

The construction of the new road Argavand-Shirak has kicked off in Yerevan.

As ARMENPRESS was informed from the press service of Yerevan Municipality, the memorandum heralding the launch of the construction of the 2.7 km road was signed by Yerevan Mayor Hayk Marutyan and Levantina Incheierea Constantino company's authorized representative Luis Lopez Moloni.

The new road the construction of which is funded by the Asian Development Bank will have 4-6 lines with an average total width of а 24-28 meters.

The new road includes a 252 meter long and 28 meter wide bridge on Hrazdan...

Read full story

Weather

Temp {{currentData.temp}}℃
Wind {{currentData.wind}}km/h
Humidity {{currentData.humidity}}
  • Yerevan
  • Abovyan
  • Tsaghkadzor
  • Sevan
  • Gyumri
  • Ejmiatsin
  • Dilijan
  • Vanadzor
  • Ashtarak
7 Day Forecast

Exchange rates

BuySell
USD475.5477.5
EUR523527
RUR7.397.5
more rates
Already available
Back to Top