Back to Top

3rd high voltage line construction between Armenia and Iran to be finished by the end of the year

armenpress.am4 hours ago
  • Email
  • Facebook
  • Twitter

3rd high voltage line construction between Armenia and Iran to be finished by the end of the year

The 3rd high voltage line construction between Armenia and Iran is scheduled to be finished by the end of the year. The new high voltage line is being constructed in the sidelines of “gas-electricity exchange project” between the two neighboring countries, ARMENPRESS reports Deputy Foreign Minister of Armenia Shavarsh Kocharyan said during the session of the National Assembly Standing Committee on Regional and Eurasian Integration.

Shavarsh Kocharyan clarified that the pipeline between Armenia and Iran is underexploited, just 20% of its total capacity. “If this deal is profitable for both sides, why don’t we get more gas and give more electricity? The reason is that the 2 existing high voltage lines do not have enough capacity”, Kocharyan said, adding that the construction of ...

Read full story

Weather

Temp {{currentData.temp}}℃
Wind {{currentData.wind}}km/h
Humidity {{currentData.humidity}}
  • Yerevan
  • Abovyan
  • Tsaghkadzor
  • Sevan
  • Gyumri
  • Ejmiatsin
  • Dilijan
  • Vanadzor
  • Ashtarak
7 Day Forecast

Exchange rates

Buy Sell
USD 478 480
EUR 528 534
RUR 7.68 7.83
more rates
Already available
Back to Top